Medusa Flight for the First Delivery

Finally, the first Boeing KC-46 Pegasus tankers were delivered to the USAF.  Not one but two tankers were delivered in the ceremony, a nice effort at a joke by Boeing having left everyone thinking it would only be one.  Then again, when you have that many of them sitting around, I guess it should have been even more!  The ceremony took place on one day and the delivery was the following morning.

The jets left from Paine Field just after sunrise.  That is sunrise if you don’t have clouds on the horizon.  The sun had barely squeaked above those when the two jets took off as Medusa 1 and 2.  They were preceded by a McConnell AFB KC-135R – the aircraft that they will be replacing.  It got airborne in very limited light and headed for Kansas.  Then the two new jets lined up in turn and departed.  No flybys or wing waggles.  Just gear up, switch to departure frequency and off into the steadily brightening sky.  Avoid the traffic inbound to SeaTac and off you go.  Lots more should be following soon while efforts continue to fix the issues with the camera system and the underwing hose and drogue pods.

State of the Pegasus Fleet

January 2019 brought a milestone for the USAF.  They accepted their first KC-46 Pegasus.  Admittedly they accepted it with a number of deferred issues that Boeing has been given a few years to resolve but that are Category 1 deficiencies.  I guess this should mean we will see a lot of deliveries in the coming weeks and months.

The backlog of jets parked up is substantial.  There are jets parked at Boeing Field on both the military ramp and the flight test ramp.  There are more scattered around the Boeing ramp at Everett.  More of them are in the conversion area at the south end of Paine Field.  More still are parked up across the cross runway.  It’s a lot of jets and, if you are an accountant, this is a level of Work In Progress that must make you squirm.  We should see them start to head on their way before too long.

West Seattle Bonuses

We made a trip to West Seattle with our guests while they were here.  We were looking at the view of the city and also wondering what wildlife might show itself.  I got a benefit in that departures from SeaTac and Boeing Field were coming to the north.  I got a couple of nice airliner shots as they climbed out over us.  They weren’t the only ones though.  A KC-46 launched out of Boeing Field and climbed over us as it went off to its test area.  I wasn’t paying attention, but my guests spotted something rocketing up behind it.  An F/A-18C Hornet from the Strike Test unit was following it, presumably for some test work.  It climbed rapidly but then leveled out, I assume to stay below the departure routes from SeaTac.  Not a bad bonus for me while showing the sights to my guests.

Details of a Pegasus

The KC-46 Pegasus test program drags on.  The delivery of jets to the USAF is still not happening and the number of jets built increases but they are stacking up at Paine Field and Boeing Field.  Meanwhile the test jets are working through test points and endeavoring to prove that the problems identified in previous tests are now resolved.  I have seen a few jets now and shot them in varying conditions from sun to downpours.

I was at Boeing Field one evening waiting to pick up someone at SeaTac later in the evening when one of the test jets taxied out from the Boeing ramp at the north of the field and came right by me prior to departing on another mission.  The jet was configured with the boom and the underwing pods so the planned final configuration.  As it came by, I decided to get some shots of the airframe to get a better idea of what the various parts look like.

The airframe is the familiar 767 although there are some changes structurally.  The cockpit is updated too but you can’t see that from the outside.  However, you can see the various sensors mounted around the airframe which, I assume, are radar detectors.  Above the cockpit is the receiver receptacle for the refueling boom to allow the jet to receive as well as dispense fuel.  You can’t see much from the ground other than the markings to guide the boomer (and the markings that identify which jet it is).

The underwing refueling pods are a source of some of the troubles the program is having.  Apparently, the supplier in the UK underestimated what was required to achieve he civil certification that is part of the contract requirements.  The pods may not be cleared when the initial jets finally enter service.  Modern pods have a more streamlined look.  Earlier pods have a blunt back end that the hose and drought come out of.  The modern pods and more streamlined and the rogue comes out of a ramp in the bottom of the pod.

The back end has the boom.  Given how many boom tankers Boeing has produced, modern booms seem to cause them a lot of trouble.  This one is still one of the major defects with the jet.  Hopefully it will be resolved soon.  The boomer does not have a window like the earlier jets but instead uses stereo video cameras to give the boomer the view of what is going on.  I assume some of the apertures around the rear fuselage are for the cameras to support this functionality.  We shall see how long it is before we see this being used for real by the USAF as opposed to the test team.

Pegasus Testing with the Hornet (and it’s not raining)

My luck with KC-46s and bad weather broke recently with a Pegasus launching out of Boeing Field on a glorious day.  It was carrying out trials work with a US Navy Hornet.  This jet was the subject of its own post.  The KC-46 followed it down the runway.  It rotated in a good location and the light was so much nicer than I have had recently so I was very happy to get shots of it as it climbed out and headed off to the airspace set aside for testing.

Sure, Wait for the Storm

When the weather starts to turn, you can assume that whatever you are waiting for is likely to show up just after it gets bad.  In this case, a KC-46 Pegasus was on its way back to Boeing Field and the clouds were rolling in.  Things were getting darker and it looked like the clouds would open.  Meanwhile, the KC-46 was still a distance away.

Sure enough, the skies opened.  By the time the jet was on final approach, the light had disappeared and the rain was belting down.  I got some shots of it but, even with a bunch of exposure compensation, the jet was more of a silhouette than anything else.  A little post processing help brought out the detail but this was not an ideal shooting situation.  A dark grey jet in dying light is just what you want!

Two Tankers

The KC-46 Pegasus tankers have appeared in the blog before but only on the ground.  That post can be found here.  I have finally seen them flying.  A couple of them were airborne on test flights from BFI and, while they had taken off quite far apart, they ended up returning quite close together so I was able to get shots of them both.  They don’t look terribly dissimilar which is what you would expect.  They are fully fitted out with the boom and one of them has the pods so this is what a service aircraft should look like when the Air Force squadrons start to get their hands on them.

Building But Not Delivering – The KC-46 Story

The tale of the USAF’s quest for a new refueling tanker has been long and drawn out.  People went to jail, awards were made and overturned.  None of that matters now.  The contract is with Boeing to produce a variant of the 767 as the KC-46 Pegasus.  The program has not been smooth.  Technical and production issues have caused delays.  The in service date has slipped and Boeing has incurred a lot of overruns.

While all of this has been going on, the production process has not stopped.  Consequently, while testing still continues, there are production airframes coming off the line.  If you go to Boeing Field, there are a bunch of test airframes on the flight line.  If you go to Paine Field, there are a bunch more that remain to be finished.  It appears that Boeing is building the airframes, sealing them up, not fitting high value items like engines, and parking them wherever there is space.  A few years ago, Paine Field was covered in undelivered 787s.  Now it is as if time has turned back because the Dreamliner’s predecessor is the type parked all over the place.

Pegasus

AU0E5087.jpgSome programs always seem to be trouble. Boeing’s efforts to turn the 767 into a tanker have not been smooth over the years. The original versions were a single boom tanker for Japan which was not too late. The three point version for Italy was a far more difficult affair and was several years late. When the USAF was after a new tanker, Boeing initially lost out to Airbus with their A330 based offer. A successful protest and s new competition followed and this time Boeing won.

Whether winning was good for them remains to be seen. The contract involves a cap on cost growth after which Boeing picks up all of the overrun. Supposedly they are already past that point so the split on overrun costs is now all theirs. Combine that with messing up the wiring and having to wire the flight test jets and you will see why the flight test program is behind schedule. The first of the four development jets flew last year in a civil configuration without the refueling equipment. It has since been on the ground at Boeing Field for further work. Very recently it took to the air again. Shortly before that, I passed by and saw it parked up on the Boeing ramp.

We shall see whether Boeing can pull back some of the delays and get the minimum number of jets into service by the contractual deadline. Whatever happens, I imagine these jets are going to become a lot more familiar in the coming years.