Tag Archives: Chicago

Early Morning City

wpid5515-AU0E4822.jpgAs you know if you follow this blog, the chance to be on the roof of a building for a helicopter lift is also the chance to get some shots of the city. We get into place well ahead of the actual lift and, while the guys are getting ready to deal with the loads, I have the time to get my gear ready and usually grab some shots of the view. High buildings have good views but not always photogenic ones. When you are above the city, you get a good view of cooling units, satellite dishes and all of the others things architects and building engineers hide on the roof out of sight of most people.

wpid5519-C59F3887.jpgHowever, all is not bad. Sometimes you just get a great view of the city from an angle that most don’t get. Being on the river opens up more options too. You are not closed in by surrounding structures – and you have a river! Not bad, eh?wpid5517-C59F3884.jpg

Some Long Line Work

wpid5505-C59F3653.jpgIt has been a while since I was up on the roof with the Midwest Helicopter team. A couple of jobs came up recently on the same morning and I went along. It was a great morning with lovely winter light and good skies, at least to start out with. Of course, these conditions in the winter also can mean low temperatures. It was 14F on the first job – not the coldest I have experienced on one of these lifts but quite close! However, when benefit of living in Chicago for a number of years is that I do have suitable clothing for cold weather.

wpid5511-C59F3753.jpgThe first job was a relatively simple one. The building was not terribly tall, maybe a dozen floors or so, and there were three cooling units going up and one old one coming down. A previous job had been done by the team on this building but this one required some adjustments. The location where the units were to be placed was on the other side of the roof and a lot closer to a far higher building. The normal 100′ line would not suffice and the 300′ option was required. This is a far rarer requirement so Jim, the Chief Pilot, decided to fly it instead of one of the other pilots since he hadn’t any experience with the 300′ line.

wpid5509-C59F3729.jpgwpid5507-AU0E4788.jpgI had plenty of space up on the roof to move around to shoot while staying out of the way of the crew. My job is to avoid them and stay out from under the loads. I do think Jim sometimes is playing a game with me as, on this job like some before, I ended up tight in a corner as it seemed like he was aiming for me! In truth I was well clear and he wasn’t chasing me but when you are looking almost straight up at the loads, they do look like they are closer than they really are.

wpid5513-C59F3812.jpgThe only disappointment for me was that the wind was coming from the west so the aircraft was tail on for most of the time. Since the light was at its best this early in the morning, that was a shame. However, not a bad start to the day.

And the First Piece is Away!

As I mentioned before, the first piece was free.  I hadn’t planned for a time lapse.  I had no idea I was going to time my visit for when this happened, nor that it was going to happen so soon.  However, I was there with the camera on a tripod so I manually shot a sequence and cut it together.  It is short but you get the idea.  I left town shortly after this so missed the new section being put in place.  I shall hope to be around when the second span is worked on.

Cutting Through the Night

wpid5756-AU0E8296.jpgI headed back to the work site later the same day to see how things were progressing.  I wanted to know how fast things were moving but I also wanted to see the work at night.  The cutting torches they are using provide a great shower of sparks but, during the day, it is hard to make that impression since they are not very conspicuous.  If they were cutting at night, I figured the effect would be more pronounced.  That certainly was the case.

Moreover, they had got a lot further than I had expected.  The section was almost totally cut free.  It was now rest on the barge ready to be moved when the final cuts were made.  As you can see from above, it wasn’t long before this happened.  They really had made swift work of the first stage of the task.

Starting the removal

wpid5733-AU0E8100.jpgThe start of the bridge replacement program I mentioned here was swift.  One of the first things they did after getting the trains shut down was to open the span that wasn’t being worked on.  This provided room to move the barges around with their loads without obstruction.  Then the team got to work on cutting loose the section that is to be replaced.  There was plenty of structure to be cut free first before the main section could be removed.  Teams were busy cutting and removing all day.  The project is underway around the clock.  Some of the shots are in the gallery below.

Wells Street Bridge Prep

wpid5731-AU0E8097.jpgA major engineering activity is underway in the city at the moment.  The Chicago River is crossed by many bridges.  Most of them are bascule bridges and they are part of a cycle of maintenance with each bridge getting refurbished periodically.  Metalwork repair and repainting is usually the order of business but, sometimes, they need more significant work.  The Wells Street Bridge is undergoing just such a work program.  Part of it is being repaired but some of the metalwork needs replacement.

wpid5729-AU0E8085.jpgThis bridge is more complex than some.  It has two levels with street traffic on the lower level and the “L” on the upper level.  Replacement is, therefore, more problematic.  Shutting down a line on the “L” is not done lightly.  The street traffic is more easily diverted so, having that closed is easier to handle and it has been shut for a while now as the preparation for the repair was underway.  The bridge has two spans and they are being done one at a time.  The south span is first.  They have prepared the section that is remaining and now they are cutting off the rest.

wpid5727-AU0E8070.jpgA new span has been constructed offsite.  This is floated to the location, the old section is cut off and the new section bolted on.  That makes it sound so simple, doesn’t it?  It obviously is a little more complex, not least because it has to be done in just over a week including replacing the train tracks and electrical systems.  These shots show the site in preparation for the big task.  I will provide updates as the job progresses.  Sadly, I have to be out of town during some of the work but will show what I can.

 

Some Skycrane Footage

The arrival of Erickson in town to carry out a lift was described in a previous post which you can check out here. While I was predominantly shooting stills for this lift, I continue to grab some video footage when the opportunity presents itself. I have put together a short video of the lift and you can see it below.

The Mighty Skycrane

wpid5424-C59F3254.jpgRegular readers of this blog will know how much I enjoy shooting helicopter lift operations in the city. Midwest Helicopters are the local operator and a great bunch of people who have helped me out lots of times. This lift proved to be one of those times although it wasn’t them doing the job. They had finished a job in the city on a very snowy morning and I was exchanging messages with their Chief Pilot when he mentioned that Erickson were in town for a job.

wpid5418-AU0E4118.jpgErickson specialize in lifting very heavy equipment. Midwest fly Sikorsky S-58T aircraft which are good for about 4,500lbs. Construction Helicopters in Michigan (who have made appearances on this blog too) have S-58T aircraft as well but tend to bring S-61Ns to Chicago since they have a higher capacity of up to 8,000lbs so can lift loads too heavy for the local guys. Erickson are a different story altogether. They build and operate the S-64 which can lift a whopping 25,000lbs. This is obviously way above the capabilities of the other operators and way more than most jobs can justify.

wpid5422-C59F3220.jpgConsequently, an appearance by Erickson in town is not so common and is worthy of a look. Moreover, they were lifting just across the river from my home so how could I not go? I have worked on site with Erickson before and so contemplated calling to arrange to be there for this job. However, I was suffering with a bit of a cold and the weather forecast did not look promising so I decided to not try and be on site but to shoot from outside the safety perimeter. Since the lift was alongside the river, getting good shots should not prove to be difficult.

wpid5426-C59F3514.jpgCome the morning of the lift, visibility was terrible and snow was falling hard. All this could be seen from my window so I didn’t need to be out on the ground. Instead, I got ready at a leisurely pace and grabbed a couple of cameras when the weather started to improve. The streets around the Hyatt Regency hotel (the location of the job) had been closed for a while which I found curious since they obviously weren’t going to start until the weather cleared. Lifting in poor conditions is tricky enough but getting to the site in the first place is more of a problem.

wpid5420-AU0E4203.jpgAs the weather started to clear, I talked to one of the crews maiming the perimeter and he confirmed that they had launched and were on their way, Time to wait. The S-64 is a big beast and you don’t have any questions when it arrives. It’s sound travels well and you know it is coming. Fortunately, there were a bunch of loads to go up (and some to come down too), so there was plenty of opportunity to shoot at different locations. Moving across the river provided some alternative views of the lift. Meanwhile, the weather was continuing to improve until it was actually sunny. Sadly, the lifting location was always in shade but you can’t have everything. Watching the downwash blow the snow around both on the ground and on the roof was quite amusing.

wpid5428-C59F3612.jpgThe lift seemed to go well and I covered everything I was after. I also got some video which I shall share later.

Wintery Suburbs

wpid5349-IMG_1396.jpgComing home to Chicago recently, we were landing just after some snow had blown through the area.  We made a slightly unusual approach to Midway and did some maneuvering pretty low over the suburbs near the airport.  I love this sort of thing since I find the rows of houses really fascinating from above.  I managed to snap a few shots out of the window as we came in.  These were grabbed with the camera on my phone so the control was a little limited but it was better than missing it altogether.

wpid5351-IMG_1400.jpgwpid5353-IMG_1405.jpgSome of the industrial buildings in the area also look cool from the air.  This part of town has a bunch of rail yards and the geometry of them is impressive from above.wpid5355-IMG_1410.jpg

 

 

Other O’Hare stuff

The trip to O’Hare for the arrival of the United 787 meant I had a bit of time to shoot some other aircraft while I was there.  I had started out at the arrival end of 28 for the 787 to show up.  When we changed rapidly to 10, I was now on a good side of the field for some of the departures.

Departures at this end can be a good selection.  Some will turn towards you and give a nice topside view.  Others head out straight or turn away so you are always wondering whether this one will be worthwhile.  I wasn’t out for a long time so this was just a chance to see what would come out before heading home.  A 747 freighter is a welcome addition but it, sadly, turned away.  Even so, it still looks cool.  A few gave me a better view.  I grabbed some shots and then headed home.