Tag Archives: construction

On Top of the City

I have been very fortunate to be on top of some of the largest buildings in the city of Chicago in recent years.  Helicopter lifting operations take me to places that are off limits to many and that provide a great perspective on the city.  However, until recently, the highest point in the city was not one I had been to.  The top of the Sears Tower (I don’t know many that use its other name) had eluded me.  The Skydeck doesn’t count of course!

This changed with the installation of the new TV antenna for ABC on top of the building.  The good team at Construction Helicopters had been contracted to install the new antenna having helped removing the old one.  We gathered early one Sunday morning for the job to commence.  This is a location that is unmatched unless you are actually airborne.  I will post some views from on high in upcoming posts.  However, the first post is an aviation themed one – no great surprise for this blog!

The aircraft used was a Sikorsky S-61N.  The aircraft was leased from a Canadian company and was actually on its last job with Construction before being returned.  They have acquired a Super Puma which I hope to see in action at some point.  The S-61N is an old design but regular upgrades have kept it as a very capable machine.  It staged out of Midway and picked the loads from down at the bottom of the tower.  The vertical climb is quite a long one but they did well, not only in placing the loads, but holding them for some time while they were secured.  Good job to everyone involved.

Up a Big Pole!

Today we have a bit of a flashback.  Regular readers will know that I shoot a lot of helicopter operations.  Midwest Helicopters is the large local operator so they do most of the work in the city.  However, there other operators that undertake similar work and some of them will work in Chicago at times.  This is often a function of the weight of the loads to be lifted.  Construction Helicopters of Howell MI are one such operator and their S-61N aircraft can lift 10,000lbs – a big increase over the 4,500lbs of the S-58T.  If you need even bigger things lifted, Erickson Aircrane are probably your people!

This piece, though, is not about the helicopter so much as the people it was working with.  A few years ago, the Trump International Hotel and Tower was built here in the city – in fact just across the street from us.  We had the best seats to watch the demolition of the old Sun Times building and the growth from a hole in the ground to 92 floors of building.  It was fun to watch, even if it did take a chunk out of our view!  The building was topped off with a spire.  The parts for the spire were lifted to the roof by the construction cranes before they were assembled but it was going to be significantly higher than the rest of the building so those cranes were not suitable for assembling it.  The pieces would be lifted into place by helicopter.

 

 

 

 

 

 

 

The first attempt at this was unsuccessful as the winds were so strong that keeping each piece in place long enough to secure it proved impossible.  There was a long wait before the second attempt but the job finally went ahead.  The heroes of this story are the guys on the tower.  If you think that the tower itself is over a 1,000′ tall and the spire is a significant (and flexible) structure above that, you can see that this is quite an exposed location to be working.  From talking to the team that assembled it, the most senior guys are the ones at the very top – they want to be there.

 

 

 

 

 

 

 

Three guys were on the spire at the top.  As each section was brought into place, they grabbed the tag lines and pulled it into position.  When they had located it, they would put in a bolt in each corner.  Then, one would climb up the new piece to release the lifting line.  The other two would follow while a second group came behind them to insert the additional bolts to finally secure the section.  While they were finishing that off, the next piece was coming in.

 

 

 

 

 

 

 

To add to the fun of this, the spire narrows as it gets higher so the working space gets progressively more limited.  All the time you are dealing with whatever wind conditions there are at this height combined with the not inconsiderable down-wash from the helicopter and trying to make sure you maintain your grip and don’t drop anything on the team below you!

The job ran a little long but they did finish it off and put the final cap in place.  They seemed to do a great job but were so far away from anyone else, I suspect that very few people appreciate exactly what they had done.  It was only recently as I was culling a bunch of old images that I looked again at them as saw exactly what they were doing.  I feel guilty for paying more attention to the helicopter operations when I first shot the job so decided to give them a little publicity now.  Well done everyone.